Projects

Current Projects
20-inch 4th High Water Main
Eastern Market
Rock Creek Sewer Separation (CSO 037)
River Oaks
Small Diameter Priority Water Main
South Capital Near Term Improvements

View More Projects
Washington, DC
Maryland
Virginia


Rock Creek Sewer Separation (CSO 037)

Project Map:

Project Location

Scope:

  • Install new storm sewer pipes to handle stormwater during wet weather events.
  • Convert the existing combined sewer system into the planned sanitary sewer system.
  • Rehabilitate over 850 feet of the existing sewer that is being converted to the sanitary sewer.
  • Disconnect all sanitary sewer lines from the CSO 037 outfall and connect it to the proposed new storm sewer lines.
  • Replace over 3,600 feet of water mains and valves in the neighborhood streets, as well as existing lead service lines, fire hydrants scheduled for repair or replacement

 

 

Project Contacts
 
Chris Odom
Anchor Construction
Project Manager
(202)269-6694

Randy Schultz
Anchor Construction
Project Superintendent
(202)269-6694

DC WASA Office of Public Affairs
(202)787-2200