Replacement of Small Diameter Priority Water Mains

Project Locations:

  • G St., SE from 3rd St., SE to Pennsylvania Ave., SE
  • 7th St., SE from G St., SE to I St., SE
  • L St., SE from 7th St., SE to 9th St., SE

Scope:
Installation of 12-in and smaller ductile iron water mains. Major work items include, but are not limited to:

  • Installation of 1,558 linear feet of 12-inch diameter water main
  • Installation of 20,708 linear feet of 8-inch diameter water main
  • Installation of 1,510 linear feet of 6-inch diameter water main
  • Installation of 104 linear feet of 4-inch diameter water main
  • Installation of 46 linear feet of 3-inch diameter water main
  • Installation of 28,400 linear feet of copper water service replacements and reconnections

 

 

Project Contacts
 
Michael Whitehead
Anchor Construction
Project Manager
(202)269-6694

Randy Schultz
Anchor Construction
Project Superintendent
(202)269-6694

DC WASA Office of Public Affairs